ANALISA PERENCANAAN PERSEDIAAN BAHAN BAKU BETON SIAP PAKAI (READY MIX) PADA PT. RIAU SARANA BETON PEKANBARU

dc.contributor.authorR, Tessa Rahmita
dc.contributor.authorTaufik Hendra
dc.date.accessioned2015-12-11T03:00:11Z
dc.date.available2015-12-11T03:00:11Z
dc.date.issued2015-12-11
dc.description.abstractInventory planning of raw material ready mix concrete is an activity to plan the amount of raw material needs at a particular time of the production process of ready mix concrete. The purpose of this study is to plan raw material requirement and cost of supplies ready mix concrete at the PT. Riau Sarana Beton in 2013 through 2017. The initial steps to plan for supplies of raw materials are analyzed with the SPSS forecasting. After it carried inventory planning of raw materials by using the Q method and the P method. As a research results obtained in each year forecasting that ready mix concrete demand is constantly increasing. In planning the amount of raw material ready mix concrete in 2013 through 2017 is for a number of 129.532.183 kg of Semen Padang, a number of 240.943 m3 of gravel and sand a number of 225.297 m3, so we get the raw material inventory costs are minimal by using Q amounting to Rp 297,737,361,050.en_US
dc.description.sponsorshipen_US
dc.identifier.otherRio Andika
dc.identifier.urihttp://repository.unri.ac.id/xmlui/handle/123456789/7634
dc.language.isootheren_US
dc.subjectPlanning inventories of raw materialsen_US
dc.subjectready mix concreteen_US
dc.subjectthe Q methoden_US
dc.subjectthe P methoden_US
dc.titleANALISA PERENCANAAN PERSEDIAAN BAHAN BAKU BETON SIAP PAKAI (READY MIX) PADA PT. RIAU SARANA BETON PEKANBARUen_US
dc.typestudent Paper Post Degreeen_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
TESSA RAHMITA_0607131340_JURNAL2013.pdf
Size:
109.09 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: