Browsing by Author "Anugrah, Anditya"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item PERANCANGAN ALAT PENGEPRESAN DAN PEMOTONGAN TABU YANG ERGONOMIS(2014-02-25) Siska, Merry; Morena, Yenita; Anugrah, AndityaActivities reaching, bending, lifting heavy loads are carried out repeatedly on the process pressing and cutting in the manufacture of tofu out not in accordance with the principles of ergonomics. Application of presses and cutting tools of tofu that designed according to anthropometry UD. Dika worker's, more ergonomic than the initial conditions. The efficiency of energy consumption by 82.6% in the process of pressing and cutting by 75.2%. Application of the design obtained during working time 8:05 minutes on the presses, 24.36 seconds on the cutting process and the resulting standard output is 7 prints. Application of the design also reduces the subjectivity of labor complaints in 27 points of the body and increase labor productivity by 16.7%Item PERANCANGAN ULANG TATA LETAK FASILITAS PABRIK DAN ANALISIS KESEIMBANGAN LINTASAN(2014-02-25) Siska, Merry; Morena, Yenita; Anugrah, Andityalndustries are required to operate more efliciently in order to compete with other industries. PT. Ewan Super Wood are engaged in manufacturing in the manufacture of plywood. Current conditions and the balance of the production facility layout line constrained production company.This study aimed to redesign the layout of the plywood manufacturing facility to minimize the path length of material handling and production line considers the balance. The approach used to redesign the layout of plant ffacilities is by using a Systematic Layout Planning (SLP), which can be categorized intD three stageS of material flow analysis phase, the research stage and the stage of the selection process. While the analysis of equilibrium trajectories using Ranked Positioned Weight (RPW). The results of this study conduded that the proposed layout chosen for the final layout used in this study showed a decrease in path length of material handling is a significant 107.2 m or approximately 24.44% shorter than the initial layout. Decreased length of the flow of material handling layout chosen also affected because by balancing production line.