MENGOPTIMALKAN WAKTU PENJADWALAN PROYEK PEMBUATAN KAPAL DENGAN SIMULASI MONTE CARLO
dc.contributor.author | Pratiwi, Erni | |
dc.contributor.author | Gamal, M. D. H | |
dc.date.accessioned | 2017-01-11T16:00:47Z | |
dc.date.available | 2017-01-11T16:00:47Z | |
dc.date.issued | 2017-01-11 | |
dc.description.abstract | This article discusses scheduling optimization of shipbuilding projects, using Monte Carlo simulation and methods PERT/CPM. Both of these methods utilize the network to determine the project schedule. Furthermore, research shows that the project scheduling using Monte Carlo simulation is better than the method PERT/CPM. | en_US |
dc.description.sponsorship | Gamal, M. D. H. | en_US |
dc.identifier.uri | http://repository.unri.ac.id/xmlui/handle/123456789/8908 | |
dc.language.iso | other | en_US |
dc.subject | Network | en_US |
dc.subject | PERT/CPM method | en_US |
dc.subject | Monte Carlo simulation | en_US |
dc.title | MENGOPTIMALKAN WAKTU PENJADWALAN PROYEK PEMBUATAN KAPAL DENGAN SIMULASI MONTE CARLO | en_US |