Browsing by Author "Taufik Hendra"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item ANALISA PERENCANAAN PERSEDIAAN BAHAN BAKU BETON SIAP PAKAI (READY MIX) PADA PT. RIAU SARANA BETON PEKANBARU(2015-12-11) R, Tessa Rahmita; Taufik HendraInventory planning of raw material ready mix concrete is an activity to plan the amount of raw material needs at a particular time of the production process of ready mix concrete. The purpose of this study is to plan raw material requirement and cost of supplies ready mix concrete at the PT. Riau Sarana Beton in 2013 through 2017. The initial steps to plan for supplies of raw materials are analyzed with the SPSS forecasting. After it carried inventory planning of raw materials by using the Q method and the P method. As a research results obtained in each year forecasting that ready mix concrete demand is constantly increasing. In planning the amount of raw material ready mix concrete in 2013 through 2017 is for a number of 129.532.183 kg of Semen Padang, a number of 240.943 m3 of gravel and sand a number of 225.297 m3, so we get the raw material inventory costs are minimal by using Q amounting to Rp 297,737,361,050.Item PERENCANAAN PERSEDIAAN BAHAN BAKU BATU BATA JUMBO DI DAERAH KULIM KELURAHAN SAIL, KECAMATAN TENAYAN RAYA PEKANBARU(2013-04-11) Rido, Rahmat; Taufik HendraBricks are building materials such as houses, shops and other buildings with raw materials are made from clay that has been burned in a furnace a thigh temperature. Brick shape is a square with a certain size. The dimensions of the bricks have variations from the regular size to jumbo size. In this research will be analyzed how much the demand of jumbo brick for the next five years in a jumbo brick production sitein Kulim area Sail Village, District Tenayan Raya Pekanbaru from 2012 to 2016. And then comparing inventories clay at this site in the unit volume of clay. The parameters used are jumbo brick production five years earlier, from 2007 to 2011. With SPSS version 17 can assistin predicting (forecasting) the clay needed for the next five years in units of m3 for the needs of the next five years from 2012 to 2016. From this results of research that the predicted results jumbo brick requirement for the next five years with a total of 16,047.80 m3. While the volume of available land that is equal to 5,717.08 m3. Thus the results of the soil analysisis available only able to meet production needs for year 2012, year 2013, and at January 2014.