DSpace Repository

ANALISA KELAYAKAN EKONOMI PEMBANGUNAN JALUR KERETA API MINANG KABAU INTERNATIONAL AIRPORT (MIA) SUMATERA BARAT

Show simple item record

dc.contributor.author Taufik, Hendra
dc.contributor.author Rizaldi, Nulvi
dc.date.accessioned 2016-08-12T01:15:16Z
dc.date.available 2016-08-12T01:15:16Z
dc.date.issued 2016-08-12
dc.identifier.issn 2460-1039
dc.identifier.uri http://repository.unri.ac.id/xmlui/handle/123456789/8620
dc.description.abstract The province of West Sumatera has the presticious international airport is known as Minangkabau International Airport (MIA). It provides positive impacts for additional traffic for aircraft. Due to that, the MIA needs a special airport transportation to encourage this facility, such as Railbus. Due to the railway construction consume a lot of cost, it is necessary to analyse its advantages and disadvantages. The purpose of this research is to carry out the economic feasibility of railway construction of the Minangkabau International Airport (MIA) in West Sumatera. This research focuses on the cost of railway construction, cost revenues from the carriage of passengers and economic feasibility analysis by using method of Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR) and Break Even Point (BEP), sensitivity analysis and based on three travelling scenarios . The result of this study may also useful as a recommendation to the stakeholders. As a result, the cost Railbus investment is Rp. 133.731.000.000,-, by using an interest rate of 14%, is obtained for the first scenario NPV = – (Rp. 244.039.750.027), BCR = 0,37, IRR = -12,24% , the second scenario NPV = – (Rp. 98.635.136.798), BCR = 0,68, IRR = -12,43%, and the third scenario NPV = – (Rp. 11.887.591.183), BCR = 0,96, IRR = -20,01%. The results of the feasibility study analysis shown that investment for the first, second and third scenarios, all the parameters indicated the econnomics investment is inappropriate to be constructed. en_US
dc.description.provenance Submitted by Dody Azwir (dody_azwir@yahoo.co.id) on 2016-08-12T01:15:16Z No. of bitstreams: 2 1. COVER DAN DAFTAR ISI.PDF: 789168 bytes, checksum: 8b495d2597f1ee126c53a09554ba8896 (MD5) 2. ARTIKEL.pdf: 640924 bytes, checksum: ba0c20ad2cea4a1f03eeb3ee042519e0 (MD5) en
dc.description.provenance Made available in DSpace on 2016-08-12T01:15:16Z (GMT). No. of bitstreams: 2 1. COVER DAN DAFTAR ISI.PDF: 789168 bytes, checksum: 8b495d2597f1ee126c53a09554ba8896 (MD5) 2. ARTIKEL.pdf: 640924 bytes, checksum: ba0c20ad2cea4a1f03eeb3ee042519e0 (MD5) en
dc.language.iso en_US en_US
dc.subject Railbus en_US
dc.subject MIA en_US
dc.subject Investment en_US
dc.subject Feasibility Study, en_US
dc.subject Sensitivity Analysis en_US
dc.title ANALISA KELAYAKAN EKONOMI PEMBANGUNAN JALUR KERETA API MINANG KABAU INTERNATIONAL AIRPORT (MIA) SUMATERA BARAT en_US
dc.type UR-Scientific Work Lecturer en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account