DSpace Repository

TINJAUAN PENERAPAN ASPEK KESELAMATAN DAN KESEHATAN KERJA TERHADAP PRODUKTIVITAS PEKERJAAN KONSTRUKSI PADA PROYEK PEMBANGUNAN THE PEAK HOTEL AND APARTMENT PEKANBARU DAN GEDUNG DINAS PEKERJAAN UMUM PROVINSI RIAU

Show simple item record

dc.contributor.author Saleh, Izzuddin
dc.contributor.author I Tri Komara Rian
dc.contributor.author Setiani3 Yulia
dc.date.accessioned 2012-12-04T06:55:48Z
dc.date.available 2012-12-04T06:55:48Z
dc.date.issued 2012-12-04
dc.identifier.other nurasmi
dc.identifier.uri http://repository.unri.ac.id:80/handle/123456789/817
dc.description.abstract Productivity is one of the important factor in determining the success of a construction project in accordance with the schedule and costs that have been planned. Many factors affect the productivity of the work, one of these factor is a occupational safety and health This research to determine impact of safety and health factors on labor productivity, then compared to the Indonesian National Standard of productivity (SNI) 7394 2008. The research was conducted on the structure stage of the building construction project of Public Works Department of Riau Province (called as project I) and The Peak Hotel and Apartement Pekanbaru (project II). Observation methods that used in measuring the labor productivity was time and motion study. While the observation of the safety and health factors used field assessment method with check list system. The analysis results of productivity on the work of reinforcement and formwork of columns and beams were found that the project I had a smaller index value of labor for workers and artisans than the project II and SNI 2008, it showed that labor productivity on project I was higher than project II and SNI 2008. For the labor index of foremen, SNI 2008 had the smallest index value (greatest productivity) than the project I and II. While the results of the safety assessment at the construction site by using a check list system showed that project I was better than project II where the value of the average ratio was 94.79% and for project II was 52.79%. Thus, from the analysis of productivity and safety and health assessment showed that the safety and health management factors in a construction project affects on labor productivity. It can be seen from the productivity of labor and the safety and health implementation on projects I was higher than project II. en_US
dc.description.provenance Submitted by nurasmi hasan (uncu_moi@yahoo.com) on 2012-12-04T06:55:48Z No. of bitstreams: 1 TSS_IZZUDDIN SALEH_0607120221_JURNAL KARYA ILMIAH.pdf: 1510298 bytes, checksum: 8f04400c982ae76aeacd461e4a7e3fb5 (MD5) en
dc.description.provenance Made available in DSpace on 2012-12-04T06:55:48Z (GMT). No. of bitstreams: 1 TSS_IZZUDDIN SALEH_0607120221_JURNAL KARYA ILMIAH.pdf: 1510298 bytes, checksum: 8f04400c982ae76aeacd461e4a7e3fb5 (MD5) en
dc.description.sponsorship en_US
dc.language.iso other en_US
dc.subject labor index en_US
dc.subject the method of time and motion study en_US
dc.subject labor productivity en_US
dc.subject occupational safety and health en_US
dc.title TINJAUAN PENERAPAN ASPEK KESELAMATAN DAN KESEHATAN KERJA TERHADAP PRODUKTIVITAS PEKERJAAN KONSTRUKSI PADA PROYEK PEMBANGUNAN THE PEAK HOTEL AND APARTMENT PEKANBARU DAN GEDUNG DINAS PEKERJAAN UMUM PROVINSI RIAU en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account