dc.contributor.author |
Riana, Ade |
|
dc.contributor.author |
Iriana Rian Trikomara |
|
dc.date.accessioned |
2012-11-28T07:11:43Z |
|
dc.date.available |
2012-11-28T07:11:43Z |
|
dc.date.issued |
2012-11-28 |
|
dc.identifier.other |
nurasmi |
|
dc.identifier.uri |
http://repository.unri.ac.id:80/handle/123456789/702 |
|
dc.description.abstract |
School as one of the physical building having important role to supporting its consumer
activities. Lack of conservancy activity resulting negative impact, that is less productivity of
activities executed by users. So that, need the estimate of maintance building cost. Estimate of
repair conservancy cost must be accurate and precisely on target because basically estimate
is very important in construction management. So that, need doing analyse comparison using
some method in approximate estimate which accurate as guidance. Persuant to analyse
results using methods in approximate estimate, damage percentage what is obtained for
Elementary School 0f 006 is 0,97%; Elementary School of 021/022 is 2,21%; and Elementary
School of 013 is 6,12%. While repairing cost is needed for each Elementary School is Rp.
18.195.000 ; Rp.77.930.00 ; Rp. 174.545.000. And repairing cost that must be provided by
government for 2012 each Elementary School is Rp. 37.569.000 ; Rp. 73.399.000 ; Rp.
57.049.000 which each Elementary School using method persuant to ceiling price per square
metre by Public Work of Departement. But condition of three building still be categorized as
light damage. |
en_US |
dc.description.provenance |
Submitted by nurasmi hasan (uncu_moi@yahoo.com) on 2012-11-28T07:11:43Z
No. of bitstreams: 1
Jurnal AdeRiana_0707120094.pdf: 257862 bytes, checksum: 19e6569c3ad1789ffe4f5d36d7fbe09b (MD5) |
en |
dc.description.provenance |
Made available in DSpace on 2012-11-28T07:11:43Z (GMT). No. of bitstreams: 1
Jurnal AdeRiana_0707120094.pdf: 257862 bytes, checksum: 19e6569c3ad1789ffe4f5d36d7fbe09b (MD5) |
en |
dc.description.sponsorship |
|
en_US |
dc.language.iso |
other |
en_US |
dc.subject |
Conservancy |
en_US |
dc.subject |
comparison |
en_US |
dc.subject |
repairing cost |
en_US |
dc.subject |
approximate estimate |
en_US |
dc.subject |
damage percentage |
en_US |
dc.subject |
ceiling price per square metre by Public Work of Departement |
en_US |
dc.subject |
rate damage |
en_US |
dc.title |
ANALISA TINGKAT KERUSAKAN DAN ESTIMASI BIAYA PERBAIKAN BANGUNAN GEDUNG SEKOLAH (Studi Kasus SDN 006 Jalan Cempedak, SDN 021/022 Jalan Mujair Raya dan SDN 013 Jalan Bambu Kuning Pekanbaru) |
en_US |
dc.type |
Article |
en_US |