DSpace Repository

PERANCANGAN ULANG TATA LETAK FASILITAS PABRIK DAN ANALISIS KESEIMBANGAN LINTASAN

Show simple item record

dc.contributor.author Siska, Merry
dc.contributor.author Morena, Yenita
dc.contributor.author Anugrah, Anditya
dc.date.accessioned 2014-02-25T04:42:11Z
dc.date.available 2014-02-25T04:42:11Z
dc.date.issued 2014-02-25
dc.identifier.other wahyu sari yeni
dc.identifier.uri https://repository.unri.ac.id/handle/123456789/5702
dc.description.abstract lndustries are required to operate more efliciently in order to compete with other industries. PT. Ewan Super Wood are engaged in manufacturing in the manufacture of plywood. Current conditions and the balance of the production facility layout line constrained production company.This study aimed to redesign the layout of the plywood manufacturing facility to minimize the path length of material handling and production line considers the balance. The approach used to redesign the layout of plant ffacilities is by using a Systematic Layout Planning (SLP), which can be categorized intD three stageS of material flow analysis phase, the research stage and the stage of the selection process. While the analysis of equilibrium trajectories using Ranked Positioned Weight (RPW). The results of this study conduded that the proposed layout chosen for the final layout used in this study showed a decrease in path length of material handling is a significant 107.2 m or approximately 24.44% shorter than the initial layout. Decreased length of the flow of material handling layout chosen also affected because by balancing production line. en_US
dc.description.provenance Submitted by wahyu sari yeni (ayoe32@ymail.com) on 2014-02-25T04:42:11Z No. of bitstreams: 3 Cover.PDF: 215211 bytes, checksum: 4c0df006435d4215bb53d2df1a2b73fd (MD5) Daftar Isi.PDF: 1259290 bytes, checksum: 6a3576fd535f03ace22491ea35d81a1d (MD5) Abstrak.PDF: 2602305 bytes, checksum: eeaa073e6373ed3c46d6e2ceee8f97e1 (MD5) en
dc.description.provenance Made available in DSpace on 2014-02-25T04:42:11Z (GMT). No. of bitstreams: 3 Cover.PDF: 215211 bytes, checksum: 4c0df006435d4215bb53d2df1a2b73fd (MD5) Daftar Isi.PDF: 1259290 bytes, checksum: 6a3576fd535f03ace22491ea35d81a1d (MD5) Abstrak.PDF: 2602305 bytes, checksum: eeaa073e6373ed3c46d6e2ceee8f97e1 (MD5) en
dc.subject Material handing en_US
dc.subject production facility layout en_US
dc.subject systematic layout palnning en_US
dc.title PERANCANGAN ULANG TATA LETAK FASILITAS PABRIK DAN ANALISIS KESEIMBANGAN LINTASAN en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account