Faizin, NurNababan, T. PGamal, M. D. H2013-04-192013-04-192013-04-19Rangga Dwijunanda Putrahttp://repository.unri.ac.id:80/handle/123456789/2944This paper discusses a method developed by Yuan-Shyi Peter Chiu, Singa Wang Chiu and Hong-Dar Lin [1] to solve EPQ model with reworking process. During the reworking process, shortage is not allowed. Therefore the consument demand’s service level is constant. This model considers the reworking cost of defective item and the time during the reworking process. A numerical example is given at the last discussionotherProbability Density FunctionEPQReworkingMODEL ECONOMIC PRODUCTION QUANTITY (EPQ) DENGAN PROSES PENGERJAAN ULANGOther