dc.contributor.author |
Ramadhan, Rahmiyati Nur |
|
dc.contributor.author |
Gamal, M. D. H |
|
dc.date.accessioned |
2017-01-12T03:04:31Z |
|
dc.date.available |
2017-01-12T03:04:31Z |
|
dc.date.issued |
2017-01-12 |
|
dc.identifier.uri |
http://repository.unri.ac.id/xmlui/handle/123456789/8911 |
|
dc.description.abstract |
This article discusses the analysis of the scheduling time housing construction projects
using Monte Carlo simulation and PERT methods. Both of these methods use a
network to facilitate the scheduling of the project. Computational results show that
the Monte Carlo simulation is more efficient and effective than PERT method. |
en_US |
dc.description.provenance |
Submitted by Rangga Dwijunanda Putra (rangga.madridista@gmail.com) on 2017-01-12T03:04:31Z
No. of bitstreams: 1
Rahmiyati Nur Ramadhan (1203111960).pdf: 327256 bytes, checksum: d8ec7c3ff2b61f0c106b53af0755c41a (MD5) |
en |
dc.description.provenance |
Made available in DSpace on 2017-01-12T03:04:31Z (GMT). No. of bitstreams: 1
Rahmiyati Nur Ramadhan (1203111960).pdf: 327256 bytes, checksum: d8ec7c3ff2b61f0c106b53af0755c41a (MD5) |
en |
dc.description.sponsorship |
Gamal, M. D. H. |
en_US |
dc.language.iso |
other |
en_US |
dc.subject |
PERT method |
en_US |
dc.subject |
network |
en_US |
dc.subject |
critical path |
en_US |
dc.subject |
Monte Carlo simulation |
en_US |
dc.title |
ANALISIS WAKTU PENJADWALAN PROYEK PEMBANGUNAN RUMAH BERDASARKAN SIMULASI MONTE CARLO |
en_US |
dc.type |
student Paper Post Degree |
en_US |