Abstract:
Pekanbaru is one of the fastest—growing city in Indonesia in term of
construction development. To support it, government builds the public
hospital which is located in Garuda SaktistreetPekanbaru. The project
had more than 100 workers and another 100 workers are working with
the heavy equipment so that can put them in danger and give an high risk
for their safety and comfort. To minimizing number of the accident in the
working place and to realization the zero accident, it is require the
implementation of SMK3 in that project. The method in this research is
quantitative and univary analysis method and also descriptive
qualitative method. Dissemination of the questionnaire was addressed to
101 construction workers and 20 staff in the project. The
Implementation assessment result SMK3 base on PP No. 50 in 2012
showed 60,13% and classified as GOOD application level. The result of
SMK3 audit assessment in RSUD Pekanbaru is 81,32% and classified as
GOOD application level as well. In the assessment of the audit result
found 30 criteria that wasn’t match with the minor and another 1 criteria
wasn’t match with the major criteria. Pursuant to the results of
calculation analysis tools and equipment procurement costs K3 is
Rp.78.036.00,00 or 0.002% from the total value of the project contract.
Factors that inhibit the implementation of SMK3 is psychological factors
of the workers and the environmental factors of the project