ANALISA DAN RANCANG BANGUN APLIKASI TRUPROJECT MENGGUNAKAN METODE CRITICAL PATH METHOD DAN EARNED VALUE MANAGEMENT

No Thumbnail Available

Date

2023-07

Journal Title

Journal ISSN

Volume Title

Publisher

Elfitra

Abstract

Improper project planning will result in losses to the company and loss of trust. Project planning needs to consider the estimated time of implementation or scheduling and budget. This is very important because each project requires a different schedule and budget. The power house construction project is one of the projects at PT. Riau Multi Cipta Dimensi which is an infrastructure development project for electricity facilities. The main objective of this research is to obtain scheduling and critical paths as well as to perform budget analysis on power house development projects. The method used is the Critical Path Method (CPM) and Earned Value Management (EVM), namely conducting an analysis of project activity planning and budget analysis on the project. This research is broken down into several stages, namely literature study, data collection, analysis of CPM and EVM calculations, conducting system development and testing. Based on the CPM analysis, the optimal power house project is 33 weeks. The total time for this project is 7 weeks faster than sequential work. The results of the EVM analysis show that the unfinished project work is Rp 5,674,853.17 and the project value that has been done is Rp 373,499,000.00. The project is estimated to be completed with a total cost of Rp 379,173,853.17.

Description

Keywords

Critical Path Method (CPM), Earned Value Management (EVM), critical path, project management, project scheduling information system

Citation

Perpustakaan

Collections